Getting paid to manage farmland hedgerows: before and after enrolling in SFI CHRW2
Most farms near Shepherdswell, Coldred and Eythorne have hundreds of metres of boundary hedgerow. Some of that hedgerow qualifies for annual payments through the Sustainable Farming Incentive (SFI) CHRW2 management action. Since May 2024, all of it is subject to a new statutory baseline under the Management of Hedgerows (England) Regulations 2024, whether you are in SFI or not. Here is what the before and after look like, and what actually changes in between.
Before
A farm on the chalk with 600 metres of field-boundary hedgerow. No SFI agreement covering the hedges. The boundaries are flail-trimmed annually on the same line each winter, cultivation runs to within a metre of the base, and no cutting records are kept. Some years the work gets done in late August or early September, fitting around harvest. Some sections get skipped two or three years running. The hedges are there, they mark the boundary, but they are thinning at the base and not particularly useful to wildlife. The 2024 Regulations apply to this holding and those hedgerows, but nobody has checked whether they are being met.
After
Two years into a CHRW2 agreement. The same 600 metres is now cut on a rotation: one side per year rather than both sides in the same pass, which lets each side carry two years of berry and blossom growth before the flail comes back. A 2-metre uncultivated buffer strip is maintained alongside each hedgerow, as required under the 2024 Regulations. Cutting stops at the end of February each year. Records are kept. The hedgerows look better from the lane: denser at the base, more growth not every stem trimmed back to the same scar. And there is money coming in: six units at £13 each is £78 per year for one enrolled side, rising to £156 per year if both sides of the same hedgerow are enrolled in the agreement.
What the 2024 Regulations require from every farm
The Management of Hedgerows (England) Regulations 2024 (SI 2024/680) came into force in May 2024. They apply to any hedgerow on or next to agricultural land that is 20 metres or longer, or shorter but joined to another hedgerow at each end. The Rural Payments Agency enforces them. The two headline requirements are:
- Cutting ban, 1 March to 31 August: you cannot cut, trim or lay a hedgerow in this window except in certain defined circumstances (road safety, pest control, land preparation for specific August sowings). The ban is now statutory, backed by civil penalties, not just a cross-compliance condition. Records of any cutting you do must be kept.
- 2-metre buffer strip: you must maintain an uncultivated strip measured from the centre of the hedgerow. No cultivation, no fertiliser, no pesticide within 2 metres of the hedge centre, subject to limited exceptions. On thin chalk at Coldred and Eythorne, that strip quickly becomes a strip of native vegetation rather than bare soil, which is not a bad thing.
These requirements are baseline obligations. Meeting them does not earn you an SFI payment on its own. What it does do is make it straightforward to satisfy the management conditions attached to CHRW2.
What CHRW2 adds: the funded management action
CHRW2 "Manage hedgerows" is a three-year SFI action that pays £13 per 100 metres per side per year for managing fully established hedgerows. It is a static action, meaning you must carry it out on the same hedgerow length in each year of the agreement. You apply through the Rural Payments Agency, and you need a legal right or obligation to maintain the hedgerow in question.
For the 600 metres on our example farm, enrolling one side gives £78 per year (£234 over the three-year agreement). Enrolling both sides of the same run gives £156 per year (£468 over three years). That is not transformational money on its own, but it is real money for work that responsible management requires anyway, and it stacks with other SFI actions: CHRW1 (assess and record hedgerow condition) is a separate action that pays for the survey and record-keeping work that many farms need to do regardless, and CHRW3 covers maintaining or establishing hedgerow trees within the same boundaries.
The full requirements for CHRW2 are on the gov.uk CHRW2 guidance page. I am not reproducing all of them here because they are updated and I do not want to give you an out-of-date version: check gov.uk/find-funding-for-land-or-farms/chrw2-manage-hedgerows before applying.
What the contractor actually does
The practical change from my end when a farm near Shepherdswell is enrolled in CHRW2 is not dramatic, but it is deliberate. Instead of trimming both sides of a boundary on the same visit, I trim alternating sides on alternating years. Where a hedge has been cut on the same line so many times it has built up a hard scar at the trim point, I move the cut line out a few centimetres each year rather than cutting back to the same place, which helps the hedge gradually recover thickness rather than just maintaining the same compressed shape. I stop working on any hedgerow on 1 March regardless of what else is in the diary, and I keep a dated record of every section cut. None of this is complicated, but it has to be agreed before the season starts rather than sorted out in the moment.
Two frameworks, the same window
The Management of Hedgerows (England) Regulations 2024 ban cutting from 1 March to 31 August. Section 1 of the Wildlife and Countryside Act 1981 makes it a criminal offence to intentionally damage or destroy an active wild bird's nest, and the main nesting season runs from roughly the same date. Around Coldred, Eythorne and the downland above Temple Ewell, the farmland hedgerows carry genuine yellowhammer and linnet nesting interest, and sometimes turtle dove. These two overlapping frameworks point to the same sensible outcome: hedge work is autumn and winter work, the buffer strip stays uncultivated, and not every hedge needs cutting every single year.
Who this is relevant to
CHRW2 is an agricultural action, so it is aimed at farmers and landowners with land registered for SFI purposes. If you manage field-boundary hedgerows near Shepherdswell, Coldred, Eythorne or Lydden and have not looked at whether your hedgerows qualify, it is worth a conversation. The 2024 Regulations apply to you anyway, so you may as well look at whether the hedgerow management you are already doing (or should be doing) can be funded.
For garden hedges, the 2024 Regulations do not apply, and CHRW2 is not relevant. The Wildlife and Countryside Act nesting-season rules still apply to garden hedgerows, as they do to any hedge.
Related guides
Managing farmland hedgerows near Shepherdswell or Coldred?
If you want to know whether your boundaries would qualify for CHRW2, or if you need the cutting done to the standard the agreement requires, call 07763 100 477 or email hello@shepherdswellhedges.co.uk. I am happy to look at the ground with you before you apply.
Sources: Management of Hedgerows (England) Regulations 2024 (SI 2024/680), legislation.gov.uk; SFI CHRW2: Manage hedgerows guidance, gov.uk; Wildlife and Countryside Act 1981, section 1; payment rate £13 per 100m per side per year confirmed from multiple current sources including Brown & Co SFI summary August 2024 (brown-co.com).